Maintenance and repair construction method: Parabola method
Maintenance and repair construction method: Parabola method
Roads will be opened within 2 to 3 hours of implementation. The non-shrink mortar for filling materials reaches over 10 N/mm² in one hour. There is a very narrow traffic restriction area, and immediate restoration to Japan without temporary repairs is possible. The surface materials specified by the association include various resin-based and asphalt-based options. 【Features】 ○ No cut cross sections occur as it is cut in a circular shape. ○ The cutting surface is curved, preventing subsidence (steps). ○ Spherical cutting section shape and cross-section. ○ Due to its spherical shape, the cutting section can be easily raised. ● For other functions and details, please contact us.
- Company:セーブマシン
- Price:Other